page 1
page 2
page 3
page 4
page 5
page 6
page 7
page 8
page 9
page 10
page 11
page 12
page 13 page 14
page 15
page 16
page 17
page 18
page 19
page 20
page 21
page 22
page 23
page 24
page 25
page 26
page 27
page 28
page 29
page 30
page 31
page 32
page 33
page 34
page 35
page 36
page 37
page 38
page 39
< prev - next > Energy Solar energy SerpentineSolarBuildManual (Printable PDF)
2.2.2 Frame Backing Plate
Use tin snips to cut to size: 915mm x 1228mm. Line with 920 x 1230mm sheet of Termo-flex
insulation (2mm thick.) Paint the underside of the backing plate with anti-corrosive paint.
Painting the inside is optional.
2.2.3 Frame Assembly
1. Position the insulated backing plate inside the channel. Rivet in place.
2. Cut three 870mm lengths of channel. These will form spacers
3. Position the separators width-ways inside the backing plate at 300mm intervals. The 63mm
section of the ā€žCā€Ÿ will make contact with the backing plate/ insulation.
4. Rivet the backing plate to the spacers.
Collector frame mounted to insulated backing frame with spacers
2.2.4 Top of the frame.
Cut a 917mm section of Channel. Drill the outlet for the pipe as described in 2.2.1.
2.2.5 Enclosing the Absorber in the Frame
Note: the absorber backing plate is drilled and the underside brackets are bolted to it from the
inside. This should be done before the absorber is enclosed in its frame.
Slide the absorber into position inside the frame, sitting on the spacers. Slide the frame top
over the serpentine outlet and rivet into place.
13